3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf Author: Chris Paternostro Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.2.3.6.F10_Currents_Risk_Assessment.pdf Author: Manoj Samant Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter |
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf Author: CECAT Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Author: Chris Paternostro Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Author: Chris Paternostro Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
3.3.1.1_Submission_of_Documentation_to_ERB.pdf Author: Manoj Samant, Bruce L. Servary, Jr. Keywords/Tags: template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems |
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Author: Eddie Roggenstein Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Author: Kasey Standridge Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf Author: FOD Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.1.D_TRBM_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.doc Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.3.1.E_TRDI_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf Author: CIL Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Author: Carl Kammerer Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Author: Carl Kammerer, CECAT Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Author: Jennifer Ewald Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
Filename | Author | Keywords/Tags |
---|---|---|
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf | Chris Paternostro | hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.2.3.6.F10_Currents_Risk_Assessment.pdf | Manoj Samant | FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter |
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf | CECAT | freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf | Chris Paternostro | ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf | Christopher Paternostro | ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf | Chris Paternostro | ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
3.3.1.1_Submission_of_Documentation_to_ERB.pdf | Manoj Samant, Bruce L. Servary, Jr. | template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems |
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf | Eddie Roggenstein | FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf | Kasey Standridge | ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf | FOD | FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.1.D_TRBM_checklist.pdf | Carl Kammerer | CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.doc | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.3.1.E_TRDI_checklist.pdf | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf | CIL | FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf | Carl Kammerer | ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf | Carl Kammerer, CECAT | FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf | Jennifer Ewald | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |