Document |
---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Author: Adam Grodsky;Richard Bourgerie Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Author: Eddie Roggenstein Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf Author: Robert Heitsenrether;OSTEP Keywords/Tags: FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program |
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Author: Kasey Standridge Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle |
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD |
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros |
5.4.1.1.C1_GOES_Enabled_Portable_Tide_Gauge_Setup&Use.pdf Author: Caleb Gostnell;Lynn Asbeck;Keith Brkich Keywords/Tags: 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,message,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm |
5.4.1.1.C2_Iridium_Enabled_Portable_Tide_Gauge_Setup&Use.pdf Author: Keith Brkich;Caleb Gostnell;Daniel Johnson Keywords/Tags: 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,Iridium,message,modem,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm |
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf Author: OSTEP Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Author: Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Author: Darren Wright, James Sprenke, Charles Payton Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.O_Hydraulic_Corrector_Field_Application_for_Referencing_the_International_Great_Lakes_Datum_of_1985_03-28-2012.pdf Author: yumiko Keywords/Tags: |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Author: Adam Grodsky, COET Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf Author: Manoj Samant Keywords/Tags: SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C18_Creating_a_Bench_Mark_Diagram_in_PDF_Format_SOP.pdf Author: Loren Evory, FOD Keywords/Tags: bench mark diagram, pdf, bm sketch, jpg, snagit, .des file, windesc, google earth, diagram, bm, ESS, Engineering and System Specifications, COET, Configuration and Operational Engineering Team |
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf Author: Engineering Division, CO-OPS Keywords/Tags: bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical |
3.2.3.3.C3_Users_Guide_for_Electronic_Levels_with_Translev_and_WinDesc.pdf Author: Bruce L. Servary, Jr Keywords/Tags: windesc, translev, leica, wild, na3000, na3003, .dat files, rod level bubble, level collimation checks, rec-module, dna03, keypad, screens, .inx file, fgcs standards, inst.dat files, rods.dat files, desc.exe, contrib.dat, country.dat, cors.dat, ssn, spsn, pid, descriptive text, wind code, weather code, sun code, observer code, error codes, user key, gif 10, dsworld, google earth |
3.2.3.3.C4_Users_Guide_for_GPS_Observations.pdf Author: Manoj Samant, Artara Johnson Keywords/Tags: global positioning system, gps, observations, terrestrial reference frame, itrf, north american datum of 1983, nad 83, online positioning user service, opus, opusdb, national geodetic survey, ngs, static, gps observation, differential, gps surveys, gps satellites, choke ring antenna, ground plane antenna, fixed-height tripod, epoch update, recording interval, elevation mask, north american vertical datum of 1988, navd 88, national spatial reference system, nsrs, orthometric, ellipsoidal navd 88 level tie, gps tie, stability code, federal base network, fbn, cooperative base network, cbn, gps water level station bench mark, gpsbm, photos, cors |
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf Author: George Leigh, Curtis Smith, National Geodetic Survey (NGS) Keywords/Tags: 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal |
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf Author: George Leigh, Kevin Bashant, National Geodetic Survey (NGS) Keywords/Tags: digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Author: Warren Krug;Kathleen Bailey Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS |
cGNSS_Field_Installation_Guide.pdf Author: Robert Heitsenrether Keywords/Tags: |
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf Author: Winston Hensley, Christopher Haith, Robert Heitsenrether Keywords/Tags: |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf Author: FOD Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf Author: CIL Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount |
5.4.3.1.E_TRDI_checklist.doc Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Author: Carl Kammerer Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Author: Carl Kammerer, CECAT Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Author: Chris Paternostro Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Author: Jennifer Ewald Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls Author: Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary Keywords/Tags: SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT |
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf Author: Keywords/Tags: |
5.5.3.1.A_eSite_User's_Guide.pdf Author: Trevor.Mackessy-Lloyd Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Author: Chris Paternostro Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
4.1.3.1_Chesapeake_Instrument_Lab_Equipment_Request_Form.pdf Author: Keywords/Tags: |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Author: Chris McGrath Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf Author: CIL Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf Author: U.S. Department of Commerce Keywords/Tags: expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M |
4.1.3.5_CIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf Author: CECAT Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf Author: Bruce Servary, OET Keywords/Tags: goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Author: Sutron Corporation Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Author: Thomas F. Landon Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
7.3.B.1.1_C-MIST_User_Manual.pdf Author: Paul Fanelli;CECAT Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS |
6.2.1.1.2_LevelRodRe-Calibration.pdf Author: Dave Hatcher Keywords/Tags: |
6.2.1.2.1_Tools_Checklist_HADCP.pdf Author: John Stepnowski Keywords/Tags: |
5.4.3.1.D_TRBM_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Author: Scott Mowery Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Author: Adam Grodsky;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf Author: Thomas F. Landon Keywords/Tags: bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Author: Richard Bourgerie Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf Author: FOD Team Leads Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
6.3.2.1.13_CO-OPS_Sensor_Elevation_Worksheet.pdf Author: A. Sanford Keywords/Tags: |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf Author: CO-OPS Engineering Division Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Author: Eddie Roggenstein Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS |
6.3.2.1.4_WaterTempComparisonSOP.pdf Author: yumiko Keywords/Tags: SOM,Station Operation and Maintenance |
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf Author: Jason Standridge Keywords/Tags: SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal |
6.3.2.1.7_Sutron_Xpert_Upgrade.pdf Author: Kevin Harrison Keywords/Tags: |
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp |
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf Author: Keith Brkich;Nathan Holcomb Keywords/Tags: SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage, |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf Author: Nathan Holcomb Keywords/Tags: SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Author: Christopher McGrath Keywords/Tags: current meter; horizontal; field library; operations; maintenance |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Author: Christopher Paternostro;Richard Bourgerie Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Author: Adam Grodsky Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq |
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf Author: Adam.Grodsky@noaa.gov Keywords/Tags: SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG |
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf Author: Caleb Gostnell, SIL Keywords/Tags: SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL |
6.5.1.1.13_GNSS_Tide_Buoy_Health_Monitoring_SOP.pdf Author: Paul Fanelli; Caleb Gostnell; Nathan Holcomb Keywords/Tags: GNSS; Tide Buoy; CORMS |
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Author: Bruce Sevary Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Author: Chris Paternostro Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Author: Seth Baldelli Keywords/Tags: met, meteorological, form, recon, reconnaissance |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf Author: Chris Paternostro Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.5_CTD_Analysis.pdf Author: Kate Bosley Keywords/Tags: ctd, conductivity, temperature, density, Castaway, Conductivity, Temperature, and Density (CTD) Observations Analysis |
3.1.1.6_Desktop_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf Author: Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli Keywords/Tags: |
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf Author: Richard.Edwing Keywords/Tags: NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team |
3.2.3.3.C1_User's_Guide_to_Vertical_Control_and_Geodetic_Leveling_for_CO-OPS_Observing_Systems.pdf Author: Manoj Samant Keywords/Tags: |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf Author: manoj.samant Keywords/Tags: bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
NGS-58.pdf Author: juliana Keywords/Tags: |
3.2.3.3.C13_VDatum_Project_Guidelines.pdf Author: Manoj Samant Keywords/Tags: PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL, |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf Author: CO-OPS Engineering Division;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf Author: Manoj Samant, Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf Author: Trevor Mackessy-Lloyd;Seth Baldelli Keywords/Tags: Air Gap; Miros; WaterLog |
3.2.3.5.E25_Hydraulic_Correctors_update_SOP_final.pdf Author: manoj.samant Keywords/Tags: |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf Author: Stephen Gill, CO-OPS Keywords/Tags: NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Author: Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.6.F10_Currents_Risk_Assessment.pdf Author: Manoj Samant Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter |
3.2.3.9.I4_EB_06_003_Modem_Setups.pdf Author: Warren Krug Keywords/Tags: telephone, phone, 56kb, voice, data, rockwell, com3, 115200, engineering bulletin |
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf Author: Warren Krug Keywords/Tags: xterm, log on, recover missing data, engineering bulletin |
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf Author: Warren Krug Keywords/Tags: ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation |
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf Author: Warren Krug Keywords/Tags: SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron |
3.2.3.9.I13_EB_09_001_Create_Water_Temp_Sensor_Replacement_Cycle.pdf Author: Caleb Gostnell Keywords/Tags: engineering bulletin, sensor vintage, greater than 9 years old, 10 years old, replace, water temp sensor, CIL, SIL, Project Instructions |
3.2.3.9.I15_EB_09_003_Xpert_LogSize.pdf Author: Caleb Gostnell. POB Keywords/Tags: sutron xpert, data collection platform, dcp, 09-003, log file, update log file size, external storage card log, storage card, flash disk, compact flash card |
3.2.3.9.I16_EB_09_004_Verify_Archive_Paros_Sensor_Configuration_During_Annual_Inspection.pdf Author: Caleb Gostnell Keywords/Tags: engineering bulletin, configuration file corruption, improperly scaled data, saltwater/freshwater coefficient |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I20-1_Xpert2_v3.4.0.6_Firmware_Upgrade.pdf Author: Kevin Harrison Keywords/Tags: Engineering Bulletin 10-003 SOP, 10-003, xterm, sutron dcp upgrade, xpert2, xpert2 software, system, firmware, upload, file transfer |
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf Author: Caleb Gostnell (POB) Keywords/Tags: engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor |
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf Author: Jason Standridge Keywords/Tags: geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS |
3.2.3.9.I23_EB_11-003_SDI-12_Addresses_Update.pdf Author: Jason Standridge Keywords/Tags: sdi-12 protocol, designations, sensor, application, address |
3.2.3.9.I24_EB_12_001_Replace_Xpert_IO_Modules_with_Firmware_Below_v2.01.pdf Author: Caleb Gostnell Keywords/Tags: analog and digital sensors, i/o module firmware version, Xpert, XDark, upgrade, Sutron, annual inspection, |
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Author: Kasey Standridge, CIL Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab |
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf Author: SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf Author: CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED |
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I30_EB_17-001_Upgrade_Satlink2_to_Firmware_v7.41.pdf Author: Chesapeake Instrument Lab Keywords/Tags: |
3.2.3.9.I31_EB_17-002_Upgrade_Xpert2_&_9210B_Dataloggers_to_OS_v3.19.0.10.pdf Author: Chesapeake Instrument Lab Keywords/Tags: |
3.2.3.9.I32_EB_17-003_Standardize_the_Number_of_Digits_for_Transmitting_Conductivity_Data.pdf Author: Chesapeake Instrument Lab Keywords/Tags: |
3.2.3.9.I34_EB_17-005_Standardize_MWWL_Sensor_Configuration_Parameters.pdf Author: Chesapeake Instrument Lab Keywords/Tags: |
3.2.3.9.I35_EB_19-001_Polycarbonate_Tube_for_ATON_Application.pdf Author: Chesapeake Instrument Lab Keywords/Tags: |
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf Author: CIL;SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf Author: SIL;CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf Author: CIL;SIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf Author: SIL;CIL Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf Author: Caleb Gostnell Keywords/Tags: SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I41_EB_23-001_CO-OPS_SDI-12_Address_Assignments_Update.pdf Author: Chris McGrath Keywords/Tags: SDI-12; designations; sensor; address; Sensor Setup; sdi-12 protocol |
3.2.3.9.I42_EB_23-002_CO-OPS_Standard_WaterLOG_Radar_Sensor_Configuration_Parameters.pdf Author: Chris McGrath Keywords/Tags: waterlog; radar; MWWL; engineering bulletin; water level; microwave; sensor; configuration; parameters; H-3611; Nile; NOAA Nile; 502; 203360 |
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf Author: Chris McGrath Keywords/Tags: waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile |
3.2.3.9.I44_EB_23-004_Limited_Release_of_Operating_System_4.0.0.20_for_the_XPERT_Family_of_Dataloggers.pdf Author: Chris McGrath Keywords/Tags: 4.0.0.20; XPERT2; XPERT Dark 2; 9210B; Datalogger; operating system; OS |
3.2.3.9.I45_EB_23-005_CO-OPS_GOES_Flags_and_DPAS_Codes_Update.pdf Author: Chris McGrath Keywords/Tags: GOES Flag; DAPS Code; GOES; PORTS Tag; sensor; designations; engineering bulletin; format; formating |
3.2.3.12.3-L1_cGNSS_System.pdf Author: Robert Heitsenrether Keywords/Tags: |
3.2.3.12.3-L2_cGNSS_Level_Method.pdf Author: Eric Breuer Keywords/Tags: |
3.2.3.12.3-L3_cGNSS_Metadata.pdf Author: Adam Grodsky Keywords/Tags: |
3.3.1.1_Submission_of_Documentation_to_ERB.pdf Author: Manoj Samant, Bruce L. Servary, Jr. Keywords/Tags: template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems |
3.3.1.2_Submission_of_Documentation_to_FERS.pdf Author: Warren Krug Keywords/Tags: field engineering review subcommittee, review board, best engineering practices, project documents, project team, required design, project lead, cover letter template, project description, system, CAD, FERS |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Author: Rachel Krasna, Steve Bassett Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
Filename | Author | Keywords/Tags |
---|---|---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf | Adam Grodsky;Richard Bourgerie | SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf | Eddie Roggenstein | FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf | Robert Heitsenrether;OSTEP | FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program |
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf | Kasey Standridge | ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle |
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf | CO-OPS Engineering Division | SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD |
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf | CO-OPS Engineering Division | SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros |
5.4.1.1.C1_GOES_Enabled_Portable_Tide_Gauge_Setup&Use.pdf | Caleb Gostnell;Lynn Asbeck;Keith Brkich | 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,message,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm |
5.4.1.1.C2_Iridium_Enabled_Portable_Tide_Gauge_Setup&Use.pdf | Keith Brkich;Caleb Gostnell;Daniel Johnson | 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,Iridium,message,modem,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm |
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf | OSTEP | FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf | Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf | Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf | Darren Wright, James Sprenke, Charles Payton | SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.O_Hydraulic_Corrector_Field_Application_for_Referencing_the_International_Great_Lakes_Datum_of_1985_03-28-2012.pdf | yumiko | |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf | Adam Grodsky, COET | SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf | Manoj Samant | SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C18_Creating_a_Bench_Mark_Diagram_in_PDF_Format_SOP.pdf | Loren Evory, FOD | bench mark diagram, pdf, bm sketch, jpg, snagit, .des file, windesc, google earth, diagram, bm, ESS, Engineering and System Specifications, COET, Configuration and Operational Engineering Team |
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf | Engineering Division, CO-OPS | bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical |
3.2.3.3.C3_Users_Guide_for_Electronic_Levels_with_Translev_and_WinDesc.pdf | Bruce L. Servary, Jr | windesc, translev, leica, wild, na3000, na3003, .dat files, rod level bubble, level collimation checks, rec-module, dna03, keypad, screens, .inx file, fgcs standards, inst.dat files, rods.dat files, desc.exe, contrib.dat, country.dat, cors.dat, ssn, spsn, pid, descriptive text, wind code, weather code, sun code, observer code, error codes, user key, gif 10, dsworld, google earth |
3.2.3.3.C4_Users_Guide_for_GPS_Observations.pdf | Manoj Samant, Artara Johnson | global positioning system, gps, observations, terrestrial reference frame, itrf, north american datum of 1983, nad 83, online positioning user service, opus, opusdb, national geodetic survey, ngs, static, gps observation, differential, gps surveys, gps satellites, choke ring antenna, ground plane antenna, fixed-height tripod, epoch update, recording interval, elevation mask, north american vertical datum of 1988, navd 88, national spatial reference system, nsrs, orthometric, ellipsoidal navd 88 level tie, gps tie, stability code, federal base network, fbn, cooperative base network, cbn, gps water level station bench mark, gpsbm, photos, cors |
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf | George Leigh, Curtis Smith, National Geodetic Survey (NGS) | 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal |
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf | George Leigh, Kevin Bashant, National Geodetic Survey (NGS) | digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf | George Leigh, Kevin Bashant, NGS | concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf | George Leigh, Kevin Bashant, NGS | outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf | Warren Krug;Kathleen Bailey | FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS |
cGNSS_Field_Installation_Guide.pdf | Robert Heitsenrether | |
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf | Winston Hensley, Christopher Haith, Robert Heitsenrether | |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf | FOD | FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf | CIL | FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount |
5.4.3.1.E_TRDI_checklist.doc | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf | Carl Kammerer | ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf | Carl Kammerer, CECAT | FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.1.D_ARGOS_Recovery_SOP.pdf | Chris Paternostro | CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf | Jennifer Ewald | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls | Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary | SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT |
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf | ||
5.5.3.1.A_eSite_User's_Guide.pdf | Trevor.Mackessy-Lloyd | eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf | Chris Paternostro | ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
4.1.3.1_Chesapeake_Instrument_Lab_Equipment_Request_Form.pdf | ||
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf | Chris McGrath | Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf | CIL | 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf | U.S. Department of Commerce | expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M |
4.1.3.5_CIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf | CO-OPS | Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf | CECAT | freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf | Bruce Servary, OET | goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf | Sutron Corporation | COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf | Thomas F. Landon | ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
7.3.B.1.1_C-MIST_User_Manual.pdf | Paul Fanelli;CECAT | dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS |
6.2.1.1.2_LevelRodRe-Calibration.pdf | Dave Hatcher | |
6.2.1.2.1_Tools_Checklist_HADCP.pdf | John Stepnowski | |
5.4.3.1.D_TRBM_checklist.pdf | Carl Kammerer | CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.pdf | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf | Scott Mowery | pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf | Adam Grodsky;Minilek Hailegeberel | SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf | Thomas F. Landon | bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf | Richard Bourgerie | dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf | FOD Team Leads | SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
6.3.2.1.13_CO-OPS_Sensor_Elevation_Worksheet.pdf | A. Sanford | |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf | CO-OPS Engineering Division | Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf | Eddie Roggenstein | maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS |
6.3.2.1.4_WaterTempComparisonSOP.pdf | yumiko | SOM,Station Operation and Maintenance |
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf | Jason Standridge | SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal |
6.3.2.1.7_Sutron_Xpert_Upgrade.pdf | Kevin Harrison | |
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf | Caleb Gostnell | SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp |
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf | Keith Brkich;Nathan Holcomb | SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage, |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf | Nathan Holcomb | SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf | Caleb Gostnell | SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf | ||
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf | ||
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf | Christopher McGrath | current meter; horizontal; field library; operations; maintenance |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf | Christopher Paternostro;Richard Bourgerie | CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf | Adam Grodsky | SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq |
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf | Adam.Grodsky@noaa.gov | SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG |
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf | Caleb Gostnell, SIL | SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL |
6.5.1.1.13_GNSS_Tide_Buoy_Health_Monitoring_SOP.pdf | Paul Fanelli; Caleb Gostnell; Nathan Holcomb | GNSS; Tide Buoy; CORMS |
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf | Bruce Sevary | reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf | Chris Paternostro | ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf | Christopher Paternostro | ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf | Seth Baldelli | met, meteorological, form, recon, reconnaissance |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf | Chris Paternostro | hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.5_CTD_Analysis.pdf | Kate Bosley | ctd, conductivity, temperature, density, Castaway, Conductivity, Temperature, and Density (CTD) Observations Analysis |
3.1.1.6_Desktop_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf | Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli | |
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf | Richard.Edwing | NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team |
3.2.3.3.C1_User's_Guide_to_Vertical_Control_and_Geodetic_Leveling_for_CO-OPS_Observing_Systems.pdf | Manoj Samant | |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf | manoj.samant | bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
NGS-58.pdf | juliana | |
3.2.3.3.C13_VDatum_Project_Guidelines.pdf | Manoj Samant | PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL, |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf | CO-OPS Engineering Division | SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf | CO-OPS Engineering Division;Minilek Hailegeberel | SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf | Manoj Samant, Minilek Hailegeberel | SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf | Trevor Mackessy-Lloyd;Seth Baldelli | Air Gap; Miros; WaterLog |
3.2.3.5.E25_Hydraulic_Correctors_update_SOP_final.pdf | manoj.samant | |
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf | Stephen Gill, CO-OPS | NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf | Minilek Hailegeberel | SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.6.F10_Currents_Risk_Assessment.pdf | Manoj Samant | FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter |
3.2.3.9.I4_EB_06_003_Modem_Setups.pdf | Warren Krug | telephone, phone, 56kb, voice, data, rockwell, com3, 115200, engineering bulletin |
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf | Warren Krug | xterm, log on, recover missing data, engineering bulletin |
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf | Warren Krug | ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation |
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf | Warren Krug | SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron |
3.2.3.9.I13_EB_09_001_Create_Water_Temp_Sensor_Replacement_Cycle.pdf | Caleb Gostnell | engineering bulletin, sensor vintage, greater than 9 years old, 10 years old, replace, water temp sensor, CIL, SIL, Project Instructions |
3.2.3.9.I15_EB_09_003_Xpert_LogSize.pdf | Caleb Gostnell. POB | sutron xpert, data collection platform, dcp, 09-003, log file, update log file size, external storage card log, storage card, flash disk, compact flash card |
3.2.3.9.I16_EB_09_004_Verify_Archive_Paros_Sensor_Configuration_During_Annual_Inspection.pdf | Caleb Gostnell | engineering bulletin, configuration file corruption, improperly scaled data, saltwater/freshwater coefficient |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I20-1_Xpert2_v3.4.0.6_Firmware_Upgrade.pdf | Kevin Harrison | Engineering Bulletin 10-003 SOP, 10-003, xterm, sutron dcp upgrade, xpert2, xpert2 software, system, firmware, upload, file transfer |
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf | Caleb Gostnell (POB) | engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor |
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf | Jason Standridge | geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS |
3.2.3.9.I23_EB_11-003_SDI-12_Addresses_Update.pdf | Jason Standridge | sdi-12 protocol, designations, sensor, application, address |
3.2.3.9.I24_EB_12_001_Replace_Xpert_IO_Modules_with_Firmware_Below_v2.01.pdf | Caleb Gostnell | analog and digital sensors, i/o module firmware version, Xpert, XDark, upgrade, Sutron, annual inspection, |
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf | Kasey Standridge, CIL | Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab |
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf | SIL | SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf | CIL | SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED |
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf | Caleb Gostnell | SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I30_EB_17-001_Upgrade_Satlink2_to_Firmware_v7.41.pdf | Chesapeake Instrument Lab | |
3.2.3.9.I31_EB_17-002_Upgrade_Xpert2_&_9210B_Dataloggers_to_OS_v3.19.0.10.pdf | Chesapeake Instrument Lab | |
3.2.3.9.I32_EB_17-003_Standardize_the_Number_of_Digits_for_Transmitting_Conductivity_Data.pdf | Chesapeake Instrument Lab | |
3.2.3.9.I34_EB_17-005_Standardize_MWWL_Sensor_Configuration_Parameters.pdf | Chesapeake Instrument Lab | |
3.2.3.9.I35_EB_19-001_Polycarbonate_Tube_for_ATON_Application.pdf | Chesapeake Instrument Lab | |
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf | CIL;SIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf | SIL;CIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf | CIL;SIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf | SIL;CIL | SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf | Caleb Gostnell | SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED |
3.2.3.9.I41_EB_23-001_CO-OPS_SDI-12_Address_Assignments_Update.pdf | Chris McGrath | SDI-12; designations; sensor; address; Sensor Setup; sdi-12 protocol |
3.2.3.9.I42_EB_23-002_CO-OPS_Standard_WaterLOG_Radar_Sensor_Configuration_Parameters.pdf | Chris McGrath | waterlog; radar; MWWL; engineering bulletin; water level; microwave; sensor; configuration; parameters; H-3611; Nile; NOAA Nile; 502; 203360 |
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf | Chris McGrath | waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile |
3.2.3.9.I44_EB_23-004_Limited_Release_of_Operating_System_4.0.0.20_for_the_XPERT_Family_of_Dataloggers.pdf | Chris McGrath | 4.0.0.20; XPERT2; XPERT Dark 2; 9210B; Datalogger; operating system; OS |
3.2.3.9.I45_EB_23-005_CO-OPS_GOES_Flags_and_DPAS_Codes_Update.pdf | Chris McGrath | GOES Flag; DAPS Code; GOES; PORTS Tag; sensor; designations; engineering bulletin; format; formating |
3.2.3.12.3-L1_cGNSS_System.pdf | Robert Heitsenrether | |
3.2.3.12.3-L2_cGNSS_Level_Method.pdf | Eric Breuer | |
3.2.3.12.3-L3_cGNSS_Metadata.pdf | Adam Grodsky | |
3.3.1.1_Submission_of_Documentation_to_ERB.pdf | Manoj Samant, Bruce L. Servary, Jr. | template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems |
3.3.1.2_Submission_of_Documentation_to_FERS.pdf | Warren Krug | field engineering review subcommittee, review board, best engineering practices, project documents, project team, required design, project lead, cover letter template, project description, system, CAD, FERS |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf | Rachel Krasna, Steve Bassett | SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |