Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Author: Adam Grodsky;Richard Bourgerie Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Author: Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Author: Darren Wright, James Sprenke, Charles Payton Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Author: Adam Grodsky, COET Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.5.3.1.A_eSite_User's_Guide.pdf Author: Trevor.Mackessy-Lloyd Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Author: Chris McGrath Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf Author: CIL Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.5_CIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Author: Sutron Corporation Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Author: Thomas F. Landon Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Author: Scott Mowery Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Author: Adam Grodsky;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Author: Richard Bourgerie Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf Author: FOD Team Leads Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf Author: CO-OPS Engineering Division Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Author: Eddie Roggenstein Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS |
6.3.2.1.4_WaterTempComparisonSOP.pdf Author: yumiko Keywords/Tags: SOM,Station Operation and Maintenance |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Author: Christopher McGrath Keywords/Tags: current meter; horizontal; field library; operations; maintenance |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Author: Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Author: Rachel Krasna, Steve Bassett Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
Filename | Author | Keywords/Tags |
---|---|---|
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf | Adam Grodsky;Richard Bourgerie | SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf | Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf | Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf | Darren Wright, James Sprenke, Charles Payton | SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf | Adam Grodsky, COET | SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf | George Leigh, Kevin Bashant, NGS | concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf | George Leigh, Kevin Bashant, NGS | outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.5.3.1.A_eSite_User's_Guide.pdf | Trevor.Mackessy-Lloyd | eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf | Chris McGrath | Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf | CIL | 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.5_CIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf | CO-OPS | Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf | Sutron Corporation | COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf | Thomas F. Landon | ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf | Scott Mowery | pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf | Adam Grodsky;Minilek Hailegeberel | SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf | Richard Bourgerie | dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf | FOD Team Leads | SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf | CO-OPS Engineering Division | Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf | Eddie Roggenstein | maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS |
6.3.2.1.4_WaterTempComparisonSOP.pdf | yumiko | SOM,Station Operation and Maintenance |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf | ||
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf | ||
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf | Christopher McGrath | current meter; horizontal; field library; operations; maintenance |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf | CO-OPS Engineering Division | SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf | Minilek Hailegeberel | SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf | Rachel Krasna, Steve Bassett | SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |