Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf Author: Manoj Samant Keywords/Tags: SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf Author: Thomas F. Landon Keywords/Tags: bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf Author: CO-OPS Engineering Division Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
3.2.3.3.C1_User's_Guide_to_Vertical_Control_and_Geodetic_Leveling_for_CO-OPS_Observing_Systems.pdf Author: Manoj Samant Keywords/Tags: |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf Author: manoj.samant Keywords/Tags: bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf Author: CO-OPS Engineering Division;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
Filename | Author | Keywords/Tags |
---|---|---|
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf | Manoj Samant | SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark |
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf | Thomas F. Landon | bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf | CO-OPS Engineering Division | Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
3.2.3.3.C1_User's_Guide_to_Vertical_Control_and_Geodetic_Leveling_for_CO-OPS_Observing_Systems.pdf | Manoj Samant | |
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf | manoj.samant | bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf | CO-OPS Engineering Division | SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf | CO-OPS Engineering Division;Minilek Hailegeberel | SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |