Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Author: Eddie Roggenstein Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Author: Kasey Standridge Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf Author: FOD Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf Author: CIL Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount |
5.4.3.1.E_TRDI_checklist.doc Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Author: Carl Kammerer Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Author: Carl Kammerer, CECAT Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Author: Jennifer Ewald Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Author: Chris Paternostro Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf Author: CIL Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
5.4.3.1.D_TRBM_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Author: Richard Bourgerie Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Author: Christopher McGrath Keywords/Tags: current meter; horizontal; field library; operations; maintenance |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Author: Christopher Paternostro;Richard Bourgerie Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.2.3.6.F10_Currents_Risk_Assessment.pdf Author: Manoj Samant Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter |
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Author: Kasey Standridge, CIL Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab |
Filename | Author | Keywords/Tags |
---|---|---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf | Eddie Roggenstein | FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf | Kasey Standridge | ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf | FOD | FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf | CIL | FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount |
5.4.3.1.E_TRDI_checklist.doc | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf | Carl Kammerer | ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report |
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf | Carl Kammerer, CECAT | FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team |
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf | Jennifer Ewald | FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf | Chris Paternostro | ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf | CIL | 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
5.4.3.1.D_TRBM_checklist.pdf | Carl Kammerer | CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.pdf | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf | Richard Bourgerie | dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf | ||
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf | ||
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf | Christopher McGrath | current meter; horizontal; field library; operations; maintenance |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf | Christopher Paternostro;Richard Bourgerie | CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.2.3.6.F10_Currents_Risk_Assessment.pdf | Manoj Samant | FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter |
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf | Kasey Standridge, CIL | Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab |