Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Author: Eddie Roggenstein Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf Author: FOD Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.1.E_TRDI_checklist.doc Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.2.1.2.1_Tools_Checklist_HADCP.pdf Author: John Stepnowski Keywords/Tags: |
5.4.3.1.D_TRBM_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.pdf Author: Carl Kammerer Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf Author: FOD Team Leads Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Author: Christopher McGrath Keywords/Tags: current meter; horizontal; field library; operations; maintenance |
3.1.1.4_HF-SCM_Recon_Checklist.pdf Author: Chris Paternostro Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Author: Rachel Krasna, Steve Bassett Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
Filename | Author | Keywords/Tags |
---|---|---|
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf | Eddie Roggenstein | FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.3.1.C_AtonAssemblyChecklist.pdf | FOD | FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab |
5.4.3.1.E_TRDI_checklist.doc | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.2.1.2.1_Tools_Checklist_HADCP.pdf | John Stepnowski | |
5.4.3.1.D_TRBM_checklist.pdf | Carl Kammerer | CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation |
5.4.3.1.E_TRDI_checklist.pdf | Carl Kammerer | CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf | FOD Team Leads | SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf | ||
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf | ||
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf | Christopher McGrath | current meter; horizontal; field library; operations; maintenance |
3.1.1.4_HF-SCM_Recon_Checklist.pdf | Chris Paternostro | hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf | Rachel Krasna, Steve Bassett | SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |