Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.
Document |
---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Author: Patrick Burke Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Author: Adam Grodsky;Richard Bourgerie Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Author: Eddie Roggenstein Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Author: Kasey Standridge Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Author: Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Author: Darren Wright, James Sprenke, Charles Payton Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Author: Adam Grodsky, COET Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf Author: George Leigh, Curtis Smith, National Geodetic Survey (NGS) Keywords/Tags: 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal |
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf Author: George Leigh, Kevin Bashant, National Geodetic Survey (NGS) Keywords/Tags: digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf Author: George Leigh, Kevin Bashant, NGS Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Author: Warren Krug;Kathleen Bailey Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS |
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf Author: Winston Hensley, Christopher Haith, Robert Heitsenrether Keywords/Tags: |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Author: Kasey Standridge Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Author: Chris Paternostro Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate |
5.5.3.1.A_eSite_User's_Guide.pdf Author: Trevor.Mackessy-Lloyd Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Author: Chris Paternostro Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Author: Chris McGrath Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf Author: CIL Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.5_CIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf Author: CO-OPS Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf Author: CECAT Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Author: Sutron Corporation Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Author: Thomas F. Landon Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Author: Scott Mowery Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Author: Adam Grodsky;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Author: Richard Bourgerie Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf Author: FOD Team Leads Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf Author: CO-OPS Engineering Division Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Author: Eddie Roggenstein Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS |
6.3.2.1.4_WaterTempComparisonSOP.pdf Author: yumiko Keywords/Tags: SOM,Station Operation and Maintenance |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf Author: Nathan Holcomb Keywords/Tags: SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf Author: Keywords/Tags: |
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Author: Christopher McGrath Keywords/Tags: current meter; horizontal; field library; operations; maintenance |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Author: Christopher Paternostro;Richard Bourgerie Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Author: Bruce Sevary Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Author: Greg Dusek Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Author: Chris Paternostro Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Author: Christopher Paternostro Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Author: Seth Baldelli Keywords/Tags: met, meteorological, form, recon, reconnaissance |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Author: Carl Kammerer Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf Author: Chris Paternostro Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf Author: Bruce Servary;Greg Dusek Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf Author: Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli Keywords/Tags: |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf Author: CO-OPS Engineering Division Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf Author: CO-OPS Engineering Division;Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf Author: Manoj Samant, Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf Author: Trevor Mackessy-Lloyd;Seth Baldelli Keywords/Tags: Air Gap; Miros; WaterLog |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Author: Minilek Hailegeberel Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf Author: Chris McGrath Keywords/Tags: SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf Author: Chris McGrath Keywords/Tags: waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Author: Rachel Krasna, Steve Bassett Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |
Filename | Author | Keywords/Tags |
---|---|---|
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf | Patrick Burke | SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon |
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf | Adam Grodsky;Richard Bourgerie | SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS |
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf | Eddie Roggenstein | FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL |
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf | Kasey Standridge | FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy |
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf | Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf | Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck | SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI |
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf | Darren Wright, James Sprenke, Charles Payton | SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass |
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf | Adam Grodsky, COET | SOM, station operation and maintenance, O&M, SRM, installation |
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf | George Leigh, Curtis Smith, National Geodetic Survey (NGS) | 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal |
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf | George Leigh, Kevin Bashant, National Geodetic Survey (NGS) | digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID |
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf | George Leigh, Kevin Bashant, NGS | concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf | George Leigh, Kevin Bashant, NGS | outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM |
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf | Warren Krug;Kathleen Bailey | FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS |
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf | Winston Hensley, Christopher Haith, Robert Heitsenrether | |
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf | Kasey Standridge | ncop,adcp,adp,current meter,deployment,recovery,ports,platform |
5.4.4.1.D_ARGOS_Recovery_SOP.pdf | Chris Paternostro | CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate |
5.5.3.1.A_eSite_User's_Guide.pdf | Trevor.Mackessy-Lloyd | eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system |
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf | Chris Paternostro | ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle |
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf | Chris McGrath | Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL |
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf | CIL | 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL |
4.1.3.5_CIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab |
4.1.3.6_SIL_Station_Configuration_Form.pdf | CO-OPS | Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab |
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf | CO-OPS | Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab |
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf | CECAT | freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT |
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf | Sutron Corporation | COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications |
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf | Thomas F. Landon | ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM |
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf | Scott Mowery | pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS |
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf | Adam Grodsky;Minilek Hailegeberel | SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust |
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf | Richard Bourgerie | dmat, maintenance, report, current meter, ports, real-time, metadata |
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf | FOD Team Leads | SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist |
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf | CO-OPS Engineering Division | Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge |
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf | Eddie Roggenstein | maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS |
6.3.2.1.4_WaterTempComparisonSOP.pdf | yumiko | SOM,Station Operation and Maintenance |
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf | Nathan Holcomb | SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1 |
6.3.2.2.2_Maintenance_Checklist_for_Real-time_Buoy_Mounted_Current_Meters.pdf | ||
6.3.2.2.3_Maintenance_Checklist_for_Real-time_Bottom_Mounted_Current_Meters.pdf | ||
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf | Christopher McGrath | current meter; horizontal; field library; operations; maintenance |
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf | Christopher Paternostro;Richard Bourgerie | CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT |
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf | Bruce Sevary | reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form |
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx | Greg Dusek | currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle |
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf | Chris Paternostro | ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle, |
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf | Christopher Paternostro | ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle |
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf | Christopher Paternostro | currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle |
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf | Seth Baldelli | met, meteorological, form, recon, reconnaissance |
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf | Carl Kammerer | currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle |
3.1.1.4_HF-SCM_Recon_Checklist.pdf | Chris Paternostro | hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle |
3.1.1.6_Desktop_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
3.1.1.7_Field_Recon_SOP.pdf | Bruce Servary;Greg Dusek | Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging |
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf | Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli | |
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf | CO-OPS Engineering Division | SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables |
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf | CO-OPS Engineering Division;Minilek Hailegeberel | SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation |
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf | Manoj Samant, Minilek Hailegeberel | SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB |
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf | Trevor Mackessy-Lloyd;Seth Baldelli | Air Gap; Miros; WaterLog |
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf | Minilek Hailegeberel | SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division |
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf | Chris McGrath | SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED |
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf | Chris McGrath | waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile |
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf | Rachel Krasna, Steve Bassett | SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist |